WB Engineers | Consultants
•  Infrastructure
•  Healthcare
•  Interiors
•  Civil Engineering
•  Legal
•  Mission Critical
•  Retail
•  Government
•  Technology
•  Sustainable Design
•  Commissioning
•  BIM
Reavis Parent Lehrer LLP, New York, NY

In collaboration with Hangar Design Group, WB designed the MEP systems for the fit-out of Reavis' 8,000 sq. ft. office in New York. WB understood that it was important to Reavis to have their project ready on the specified move-in date; we met all of the established project milestones. One way that WB helped Reavis to achieve their goal of efficiency was to design two split air-cooled air conditioning units, one serving the conference room (south) and one for the IT room.

Architect:
Hangar Design Group
New York, NY
Bracewell Giuliani
Gesmer Updegrove
Harris Williams
Nixon Peabody
Outten & Golden
Reavis Parent Lehrer LLP
Reboul, MacMurray, Hewitt, Maynard
 & Kristol

Sills Cummis Epstein & Gross P.C.
Sutherland Asbill & Brennan
Tannenbaum Helpern Syracuse & Hirschtritt
US Legal
Windels Marx Lane & Mittendorf