EnerNOC, Boston, MA
WB provided MEP, IT and security system design for the fit-out of this network operation center (NOC). The project included a 24/7/365 NOC and modular furniture positions, closed offices, a conference room and a reprographics area.
Significant project features include an access control system for the NOC, an eight panel display wall, and an information technology room.